Contact Us

World Wide:               +27 18 2970326
Support:         This e-mail address is being protected from spambots. You need JavaScript enabled to view it.  
Sales:              This e-mail address is being protected from spambots. You need JavaScript enabled to view it.  
Channel Partners:
International Contacts
 

Maintenance Optimisation

Key issues:

  • Due to system lengths (+-100 km pipeline between tap off points) long periods for maintenance is required.
  • Ensure Client delivery rates are met during maintenance intervals.
  • Reduce pumping requirements.
  • Quick what if studies of various system configurations.

Methodology:

  • Familiar and easy to use interface for Engineers.
  • Steady State Simulation to provide quick answers.

Solution:

  • Flownex Model provided comprehensive tool to quickly and efficiently determine various maintenance distribution scenarios which ensured all client delivery rates were achieved.