Key issues:
- Reduce risk of “will it work” uncertainty.
- Component sizing and matching off the shelf components.
- Determine workable start up procedure.
- Prove concept within time and cost constraints.
- Controllability of the plant – during load following.
Methodology:
- From mass and energy balance create Dynamic Flownex model.
- Components were evaluated at design and off design conditions – Load following transients.
- Start up sequence were planned and risks addressed.
Solution:
- Understand system dynamic behaviour.
- Proof of concept in time and budget (Cost saving of $48M)!