Key issues:
- Full scope high fidelity training simulator for operator training purposes.
- Integration with an emulation of the GE and Emerson plant control systems.
- Real time Simulation.
Methodology:
- Develop Full Scope Simulator.
- Simulator use for Operator Training and Engineering analysis.
- Entire plant, control system and user interface simulated.
- Use Familiar General Electric SCADA.
Solution:
- Entire plant, control system and user interface simulated in Flownex in real time on a desktop computer.
- Import Entire General Electric SCADA.