Performance Investigation

Key issues:

  • Ensure superheater outlet steam properties meet the turbine requirements.
  • Reduce calculation time.
  • Identify two phase regions, Flashing, Superheating.

Methodology:

  • Determine pressure drop over the superheater element of a boiler.
  • Investigate possibility of Two-phase flow expected in certain sections of the superheater.

Solution:

  • Two-phase flow  was found in the section between the drum and inlet to the first heating element.
  • The temperature and pressure at the outlet header exit  were within 0.04% of required results.