Key issues:
- NOx and SOx regulations necessitated improved combustion.
- Secondary Over Fire Air (SOFA) installed into existing plant.
- Problems experienced with air distribution as well as delayed transient behavior with regards to the measured O2 content of the flue gas at the economizers.
Methodology:
- Simulations with and without SOFA.
- Simulations to investigate possible new ducting and duct routing.
- Simulations with regards to different control philosophies.
Solution:
- Improved flue gas O2 content response due to feed forward signal.
- No significant improvements due to new ducting and duct routing.
- Leave client with a customizable model of system.